Also got the soleniod & safety latch laid out. Should have these in place tomorrow & the door hung & check the window movement. Than all off again ,get the grinding & body filler done @ the rear hinge support,run the wiring,get the seat belt mechanism relocated !
These Lokar pulley set ups are a big help!
truck action
+1y
Got the seat belt moved over 1 1/4"
truck action
+1y
Got the door spacing dialed in & the handle working smoother with a added pulley,& worked out the lay out for the safety latch & soleniod
truck action
+1y
And the drivers door is hung & swinging
truck action
+1y
Lots of welding tomorrow,& a lot of work still in front of me,but can see the light!
2
2lowtoy
+1y
Damn that looks really really good
truck action
+1y
Thank you!
A lot of work doing it the way I am ,& I still have a lot of work in front of me!
Trying to finish for DANGER ZONE 3-27
truck action
+1y
Well got the door limiter made & in place @ the passenger side Z& got the first filler coat on.
Started the welding on the drivers side!
truck action
+1y
Got the drivers side front & rear body ends all welded up & smoothed out