ive got a fb set up now with 4 valves. im now gonna make it have 4 valves up front. what do it need to do to add the new valves up front? can i just add a T to what i have now or do i have to redo some other plumbing?
thanks guys
u need to have a fill and dump per side. its just like u have now except instaed of having 2 vavles for 2 wheels, u have 2 valves for one wheel so u will need to take of the T and run a new line from the tank to the the other 2 valves.
would this work
line coming from tank goes into a T
then one goes to each valve then T into the bags??????
sorta, u dont need the T between the 2 bags now, put the T so u cna plumb the fill of both front bags not from bag to bag.
thanks guys
hopefully tommorrow i will hav time to get the new valves in
got it figured out yesterday and got everything working. that sumbitch is fast as hell now