Thanks. Did some more work on the floor today.
Finished tacking all around the edges.
[IMG]
http://i563.photobucket.com/albums/ss76/stradarx150te/ranger/20130225_154526_zps37ff3ced.jpg[/IMG]
Then trimmed some of it to do a test fit need to trim some more and it will be good.
[IMG]
http://i563.photobucket.com/albums/ss76/stradarx150te/ranger/20130225_171413_zps8cd638de.jpg[/IMG]
The part of the floor by the door will be bent down.
[IMG]
http://i563.photobucket.com/albums/ss76/stradarx150te/ranger/20130225_171447_zps618d1d33.jpg[/IMG]
Hoping to get the other side all welded tomorrow and then get them both in there. Then I can weld in the trans tunnel, then start on the fire wall.