Adam's Ranger in for yota front clip, bags on 20's and custom bed floor Yota clip tied in now time to fab some simple engine mounts then triangulate lower arms and bag front
started wishbone/gastank xmember lots of plating and gusseting left to dowishbone built
Front bagged ready for reassembly and hooking up ford colum to yota steering and ford powering steering pump to yota sector
clearancing the rear frame for bag clearance once its centered on lower link barready for gussets
start of the ac blower box by Keef
still gonna trim the hole for the wishbone then add side fillers to meet up with the front one then brake line will be welded and smooth around whole lower edge for strength and a nice rolled edge
World famous Beer photographer Jokr (LOL) caught me working ha
bed turned out really cool!
Thanks man got prob 5 or 6 more hours to put in it and itll be complete
That has turned out awesome. Excellent work my man.