I wish!!!!! Jimmy has been slowly working on it, but it still hasn't seen any body work yet. He put bigger tubs in the rear because they were not wide enough and has gotten some more sheet mteal work done. Hopefully it will be in primer soon. I am supposed to take the motor and tranny out and run it to Flagstaff to have the motor rebuilt on JULY 30th..... hear that Jimmy? Hess will be coming into town on JULY 30th (Jimmy HINT HINT).
hess
+1y
Going to AZ in 3 days and finally get to see the Amigo with my own eyes.
tre5
+1y
Jimmy has been working on it like crazy. There is a ton of work on the inside sheet metal. He went all the way to the firewall with the tranny/ driveshaft tunnel. The rear has all been capped and the tubs and hatch are done. Body work will hopefully be getting started tonight. I was there today to check on it.
sikness
+1y
This thing is a beast....Love it!! Sik ass work!!
tre5
+1y
crewcabondubs
+1y
that looks badass.
tuckinlugs06
+1y
so what are they making te rear like a truck bed with a back glass?
tre5
+1y
Open air. No back glass. The rear part is just like a permanent convertible. We are thinking we may put a sliding rag in the roof as well.
smctoy
+1y
looks awesome
crewcabondubs
+1y
cant wait to start on mine. not gonna have 22s but i havent decided on air or hydros.