that looks good and all, but why not cut it at half the full angle? 45*= 22.5 on each rail.
because more welding surface = a stronger joint
purplekush
+1y
too much effort for something that could be done alot easier
but it will work
drill and plugweld a few spots on it tho
pootytang
+1y
allready welded, i'm gonna use some side gussets.
dirkbelt
+1y
looks good to me just drill some holes and plugwield it,lol
just had to add that cause after the first person said it like 10 other repeated it,lol
chillnlikavilln
+1y
you a buddy of mine is a weld inspector and he told me that you should only bevel 1/4 and up.he told me when i was doing mine that when you bevel less than 1/4 it is a weak weld. he is one of less than 100 people in the us that has some of the ndt certs for his field so i kinda rolled with what said.
bdroppeddak
+1y
we build all kinds of structural parts and any butt welded joint gets beveled so the weld will lay in nicely, not only is it stronger, but it looks better.....
granth
+1y
Originally posted by lowjoeram
Originally posted by framedragger
that looks good and all, but why not cut it at half the full angle? 45*= 22.5 on each rail.
because more welding surface = a stronger joint
honestly after looking at the pics, it doesnt look like he got that much more surface area than a 1/2 angle cut. but, as long as hes happy. just a whole lot easier to figure out and might even be a bit more precise to do it cutting just two angles rather than all those notches.
pootytang
+1y
couldn't use a 45 angle, would interfere with the bag location and push them back too far on the bars.
granth
+1y
not necessarily a 45, but any angle/cut in half, will get you a perfect mating surface.