Sawzall. Took like 20 minutes to get that far. Bracing the bottom won't take much longer. Probably an hour long project if you do it all at once.
Looks like i gots to go borrow the sawzall!!
that'll be tomorrows project!
buy your own sawzall fool
Well I cut it off just now...
Interesting enuff the frame is 2.75" tall where I cut...
Mine is about the same. Loos good, now just line it up.
thats the plan for later tonite if i have time... gotta go to my little cousin's bday... yippy... LOL.
The sawzall cut thru that like butter! way faster than a cutting wheel would have been!
Well i got it all cleaned up and got rid of all the ugly shit on it tonite... i'll take it in and make the filler peices and stuff for it tomorrow
So much for an hour long project. Lol.
Originally posted by blazedbowtie82
So much for an hour long project. Lol.
tell me about it... the whole frame build has been like that... i want to make everything as clean as I can so its been a lot more work than the average build.
Originally posted by iLLairgasm
Originally posted by blazedbowtie82
So much for an hour long project. Lol.
tell me about it... the whole frame build has been like that... i want to make everything as clean as I can so its been a lot more work than the average build.
I know how that goes. But I still work pretty fast. I'm trying to build my truck as cleanly as possible. But I don't want to take the cab off... At least not right now. I don't feel comfortable doing it yet.