PROJECT: 1LOWB22.

15770 views
173 replies
33 following
K
PROJECT: 1LOWB22.
slammedyota91 avatar
slammedyota91
+1y


READ Chris READ
dragn37 avatar
dragn37
+1y



LOL, of course. That was only to get a better measurement of where the notch was needed to be put it.
dragn37 avatar
dragn37
+1y


Thanks
sleepyspeed avatar
sleepyspeed
+1y


Saftey glasses, I'm impressed. Trucks coming along fairly quick
cl (chris) avatar
cl (chris)
+1y
Damb i miss one blurb about a 4link and..............LOL
dragn37 avatar
dragn37
+1y
Still got about 5 inches to go in the back (front leaf spring mounts) Then about another 4 in the front (wheel wells)


91b2200(cody) avatar
91b2200(cody)
+1y
good job.loookin good .
toddluck avatar
toddluck
+1y
keep the ghetto two link its rad...lol....good build man keep the pics commin
dragn37 avatar
dragn37
+1y
Bump: Still waitin for other 2 links FBI forgot to send me...

In the meanwhile, i got one wheel well cut out, cleaned up. Now im working on relocating the other side.




Here are some pics of my freinds trucks..







and a little video i made for my freind

speed_cult avatar
speed_cult
+1y
Coming along nice, but that first lime truck has got to ditch them lights....well... IMO at least lol. Also FBI?

thread post photo


Yeah I kinda made the same mistake. Wanted to upload a photo chop I did to kinda kiss Devs ass lol so when my next project comes, he remembers me ROFL.
Post was last edited on Oct 03, 2008 04:53. Edited 3 times.