Search
Toggle search
Login
Register
Toggle sidebar
Search
Mazda Projects
Project Drag Star (Pg. 21 Finished)
Project Drag Star (Pg. 21 Finished)
Mazda Projects
40002 views
335 replies
44 following
Project Drag Star (Pg. 21 Finished)
twisted minis
+1y
Sure.
B
blastation
+1y
yeh if you selling the link bars, how much just wondering.
slammedyota91
+1y
todd you still want my 2 bars or no?
twisted minis
+1y
$50?
twisted minis
+1y
I just ordered $200 worth of 4-link stuff.
As well as a new tube die, and a set of dimple dies, and a chop saw.
B
blastation
+1y
pm sent for the bars seth
slammedyota91
+1y
sweet shit man, how long do you have this truck for?
twisted minis
+1y
Has to be done for Reso. So however long it takes.
slammedyota91
+1y
whens reso? lol
twisted minis
+1y
December 27th. So I have 2 months to do about 3 months worth of work. I could get it done faster if I didn't have school or work.
Previous
1
2
3
4
5
Next
Related Discussions in Mazda Projects
Thread
Posts
Last Post
Twin Turbo Mazissan (87 B2200)
B
last post by
Brandon
+1y
52
52
B
last post by
Brandon
+1y
Taking it back old school
F
last post by
feemc
+1y
132
132
F
last post by
feemc
+1y
***SkrapinSask from stock to layin frame***
last post by
skrapinsask
+1y
852
852
last post by
skrapinsask
+1y
Cherokeed's 91 b2200 Cab Plus (Clean Stock Daily Driver)
last post by
cherokeed
+1y
150
150
last post by
cherokeed
+1y