oh i see.. what setup are you gonna run... like valves, bags, tank, etc...
It was already bagged. Contitech bags. 450psi G.C. valves. 5 gallon air tank. Three eighths line in front, Half inch in back. Usually the work that's being done to the truck don't take very long, but it's been REALLY HOT lately. So we just work on it whenever we can stand the heat. Should only be a couple more weeks though.
why are you running 3/8 in the front and 1/2 in the back?