PROJECT: JENNAY(update 7/4/07 really big pics)

2313 views
59 replies
37 following
K
PROJECT: JENNAY(update 7/4/07 really big pics)
KEEF avatar
KEEF
+1y
very impressive that thing is gettin more and more badass i cant wait to paint it hint hint LOL
bodydropped85 avatar
bodydropped85
+1y
Originally posted by Dejavu



how long was the wait to get in with the little shop?

not sure, if your a baller like gump is, soon
LowOrange88 avatar
LowOrange88
+1y
Dude, that dash and upper door panels are SICK! Bad ass. Whats the plan to finish the door panels?
Gump1986 avatar
Gump1986
+1y
Originally posted by Dejavu



how long was the wait to get in with the little shop?

I didn't have too much of a wait to get it into Eric. This was a relatively small, quick job for him, turned around in a little over a month.

Gump1986 avatar
Gump1986
+1y
Originally posted by LowOrange88



Dude, that dash and upper door panels are SICK! Bad ass. Whats the plan to finish the door panels?

the bottom of the door panels beneath the metal will probably be done in a black leather tuck and roll or whatever else cool comes to mind when i get around to the interior.

bodydropped85 avatar
bodydropped85
+1y
dead possum hide or shrimp shells.
fatboysS1O avatar
fatboysS1O
+1y
dayyyummmmm..............looks fuckin kickass Gump!! im jealous! so jealous im gunna buy a ranger and copy it exactly!
bodydropped85 avatar
bodydropped85
+1y

bodydropped85 avatar
bodydropped85
+1y

bodydropped85 avatar
bodydropped85
+1y