just a question, but im gettin ready to biuld a new frame this winter (way to much dragging) and i think im lookin toward a stock floor body drop. i was wondering if u have to tub the firewall for this. i didnt have to to lay 20s now with the frame zd 2 3/4in. i was just wondering how much work im bought to get into.