3.0 stock. intake.
in progress. begining body work in 2-3 weeks.
in progress.
glass in the works.
air zenith, 8 1/2" valves, 5 gal, currently cans...going to bags.
just 18" rollers for now, plannin 20"s
glass and smooth-out entire interior, wide body, considering converting to right hand drive. cantilevering the rear bags. see you at the shows this summer!